LSSE provides wastewater facilities planning, design, bid document preparation and construction phase for new systems, rehabilitation of existing systems, as well as unique source reduction (inflow/infiltration programs). Recent experience includes planning through construction phase services for over 162 miles of sanitary/combined sewers and 10 wastewater treatment plants. LSSE has also maintained a prominent role in one of the nation’s largest and most complex wet weather control programs, the Allegheny County (ALCOSAN) wet weather control program mandated under a Federal EPA Consent Decree, which has an estimated cost of over $ 3 billion. No other regional, western Pennsylvania firm had equivalent status in this multi-phase regional program, which involved eight teams lead by one of the nation’s Engineering News-Record (ENR) Top–10 Wastewater Engineering firms.
Facilities Planning, Design, Construction Phase, and Surveying Services:
- Separate Sanitary Sewers
- SSO Elimination
- Combined Sewer Separation
- CSO Mitigation
- Pump Stations
- Small Diameter Pressure Sewers
- Wastewater Treatment Process
- Grit Removal
- Odor Control
- Biological/Chemical Treatment
- Clarification
- Disinfection
- Solids Management/Disposal
- Flow Equalization Facilities
SPECIALIZED STUDIES/INVESTIGATIONS:
- Community and Multi-Jurisdictional Wastewater Facilities Planning (PA Act 537), Design and Permitting
- Consent Order and Sewage Facilities Corrective Action Plans
- Operation and Maintenance Programs
- CSO/SSO Characterization Studies/Evaluations
- Wastewater Process Optimization
- Hydraulic Re-Rating Studies
- Industrial Pretreatment
- Rate Studies
- PA Act 57 Tap Fee Analysis
- Developer Reviews
- Annual/Capital Budgets
- Permit Renewals
- Chapter 94 Reports
- Vulnerability Assessments
- Grant Assistance/Administration
- GIS – Asset Management
- Infiltration/Inflow (I/I) and Source Reduction Studies
- Flow Monitoring and QA/QC Analysis
- Flow Isolation Studies
- Present Worth-based Cost-effectiveness Analysis
- Design
- Permitting and Implementation
- Post Project Certification
- Hydraulic and Hydrologic Modeling/Analysis
- Partial Parallel Replacement to eliminate SSO’s and achieve significant RD I/I and GWI Flow Reduction
- RTK Analytic Parameters to be put into SWMM Models to assess Pipe Capacity Analysis