LSSE provided engineering and construction phase services for Center Township Water Authority’s new $63 million potable water source of supply and surface water treatment plant. This complex public works project is being delivered in two phases on an accelerated schedule dictated by a third-party requiring an 18-month period for completion of alternatives analysis, treatability studies, sampling, detailed design, permitting, bidding, construction and start-up of Phase 1.
Phase 1 of the project includes the construction of a river intake system and interim conventional surface water treatment plant.