McKay Street Stormwater Improvements

McKay Street Stormwater Improvements – Edgewood Borough

Scope of work generally includes the installation of approximately 360 linear feet of stormwater sewer pipe, connection to existing storm sewers, storm manhole installations, and all necessary appurtenances and restoration for said construction. The goal of the project was to redirect stormwater flow
from beneath abutting households and relocate the stormwater infrastructure along the public roadway. In addition to stormwater infrastructure improvements, the project resulted in the resurfacing of Reiter Way from Race Street to McKay Street.

Services provided included layout & grading, budgeting, grant preparation & administration, right-of-way surveys, topographic surveys, and preliminary / final development plans.