Broadhead Road Waterline Improvements – Center Township Water Authority

Broadhead Road Waterline Improvements – Center Township Water Authority

LSSE’s scope of work for this waterline replacement project included preliminary design; hydraulic modeling; utility coordination; permitting; final design and construction phase services (full-time resident project representation and shop drawing review) for installation of approximately 5,900 LF of 16-inch waterline along State Route 3007 (Brodhead Road) in Center Township, Beaver County, Pennsylvania. Work was completed during nighttime hours as a result of traffic volume and PennDOT daylight working hour restrictions, and in accordance with an accelerated schedule as dictated by PennDOT in advance of roadway resurfacing.

This project was necessary to replace aging parallel water distribution mains that required frequent maintenance along this high-traffic state roadway within a primarily commercial district.  A hydraulic modeling study was completed, and determined that a single 16-inch waterline would be the optimal size waterline to replace the existing parallel 12-inch and 8-inch waterlines.

Final design and layout included preparation of rights-of-way exhibits and meetings with property owners (residential and commercial) to secure necessary easements to relocate the new 16-inch waterline outside of the PennDOT right-of-way within private easements, where feasible, to accommodate future operational considerations within this high-traffic PennDOT roadway.  This project included the development and review of different alignment alternatives with the Owner, with consideration of intersecting waterline tie-ins/reconnections, construction cost, location of existing utilities, and future maintenance needs.

The PennDOT RNA stipulated restrictive daylight working hours; therefore, construction was performed during nighttime / off-peak hours. LSSE provided full-time resident project representation and construction engineering services for the duration of construction. This project was completed under budget, ahead of schedule, with no Alleged Violation Reports (AVRs) and minimal construction-related complaints from adjoining property owners or motorists.

MARKETS:

  • Utilities and Infrastructure

SERVICES:

  • Civil – Environmental Engineering
    • Potable Water Facilities Engineering
  • Surveying
Duquesne University – Murphy’s Bottom Ecological Project Pleasant Hills Borough Wet Weather Facilities Findlay Industrial Park – Phase 3 North Fayette Community Center Indiana University of Pennsylvania FEMA LOMR Water System Study & Improvements – Brighton Township Municipal Authority First Energy Nuclear Operating Company (FENOC) McKay Street Stormwater Improvements Erie East Bay Front Greenway Trail Center Township Municipal Building Renovations Baldwin Colewood Interceptor Upgrades and Rehabilitation, Equalization Tuscan Hills Development Allegheny Valley School District Engineering Services Municipal Water Authority of Aliquippa – Water Filtration Plant Coraopolis GIS Program Pine Synthetic Fields Utah Street Waterline Replacement – Neville Township Mapping and Facilities South Side Works Carnegie Mellon University Castle Shannon Borough Grove Road Bridge Reconstruction Ridge Road Industrial Park Oakwood Manor North Sewickley Township Sewage Facilities Collection Peoples Natural Gas Elkhorn Run STP Final Clarifier Rehabilitation North Fayette Township Zoning Map Findlay Industrial Park – Phase 1 NPDES Compliance & Long-Term Control – West Newton Borough Washington Mall Redevelopment – Demolition Donohoe Road Sanitary Sewer Extension Coraopolis Water System Improvements Louisiana Avenue Stormwater Improvement Brighton Road Lift Station Improvements Martinsburg Nitrate Removal Water Treatment System Edinboro University – Infrastructure Upgrade Sanitary Sewer CCTV & Manhole / Point Source Repairs – Oklahoma Borough GetGo Flood Protection Project – Tucker County, West Virginia  Findlay Industrial Park – Phase 2 Bridgewater Crossing – Brownfield Redevelopment Westport Ridge Building No. 2  & 3 Southmoreland High School Parking Lot Stormwater Improvements Pleasant Hills Breisinger Field North Fayette Trail Connector 3 Rivers Wet Weather, Inc. Program Manager Contract Gordon Food Service (GFS) Distribution Center Village of Lawrence Sewage Facilities Project Castle Shannon Borough Parks Walker Park Stream Restoration – Edgeworth Borough Castlewood Fields Findlay Industrial Park – Phase 4 Broadhead Road Waterline Improvements – Center Township Water Authority Moon Township Police Station ALMONO – Mill 19 3 Rivers Wet Weather Green Stormwater Infrastructure Feasibility Study Borough of Seven Fields Villas of South Park Ambridge Water Authority Partial Hydraulic Model Flow Test Map Braddock Lock and Dam Collier Township Community Park Pilot – Findlay Location Leetsdale Industrial Park G.E. Additive Technology Building Columbia Gas Pleasant Hills Municipal Building Charles E. Kelly Recreation Park – Collier Township North Fayette Township Municipal Complex / Public Works Garage Pennsylvania American Waterline Projects Representative Moon Township Parks Center Township Potable Water Neville Township Water Distribution System Oak Grove Road Stormwater Improvements Beech Street & Elmer Street Stormwater Improvements – Edgewood Borough Moon Township Public Works Garage Clintonville Water Storage Tank Pheasant Crossing Residential Development Elkhorn Run Sewage Treatment Plant Headworks Improvements Road Program Summary Map – Baldwin Borough Westport Ridge Building 1 Chapman Westport Hillwood Development – Parcel A BASF Water Service Connection Hempfield Area School District Stormwater Management Improvements Coraopolis Riverfront Park Linesville Borough – Water System Improvements FedEx Ground National Expansion Program Donovan Farms Ridgeview Estates South Home Stormwater Improvements Center Township Park Improvements The Home Depot Martinsburg Municipal Authority Wastewater Treatment Plant