Broadhead Road Waterline Improvements – Center Township Water Authority

Broadhead Road Waterline Improvements – Center Township Water Authority

LSSE’s scope of work for this waterline replacement project included preliminary design; hydraulic modeling; utility coordination; permitting; final design and construction phase services (full-time resident project representation and shop drawing review) for installation of approximately 5,900 LF of 16-inch waterline along State Route 3007 (Brodhead Road) in Center Township, Beaver County, Pennsylvania. Work was completed during nighttime hours as a result of traffic volume and PennDOT daylight working hour restrictions, and in accordance with an accelerated schedule as dictated by PennDOT in advance of roadway resurfacing.

This project was necessary to replace aging parallel water distribution mains that required frequent maintenance along this high-traffic state roadway within a primarily commercial district.  A hydraulic modeling study was completed, and determined that a single 16-inch waterline would be the optimal size waterline to replace the existing parallel 12-inch and 8-inch waterlines.

Final design and layout included preparation of rights-of-way exhibits and meetings with property owners (residential and commercial) to secure necessary easements to relocate the new 16-inch waterline outside of the PennDOT right-of-way within private easements, where feasible, to accommodate future operational considerations within this high-traffic PennDOT roadway.  This project included the development and review of different alignment alternatives with the Owner, with consideration of intersecting waterline tie-ins/reconnections, construction cost, location of existing utilities, and future maintenance needs.

The PennDOT RNA stipulated restrictive daylight working hours; therefore, construction was performed during nighttime / off-peak hours. LSSE provided full-time resident project representation and construction engineering services for the duration of construction. This project was completed under budget, ahead of schedule, with no Alleged Violation Reports (AVRs) and minimal construction-related complaints from adjoining property owners or motorists.

MARKETS:

  • Utilities and Infrastructure

SERVICES:

  • Civil – Environmental Engineering
    • Potable Water Facilities Engineering
  • Surveying
Clintonville Water Storage Tank Findlay Industrial Park – Phase 4 Center Township Municipal Building Renovations Broadhead Road Waterline Improvements – Center Township Water Authority Castle Shannon Borough Grove Road Bridge Reconstruction Gordon Food Service (GFS) Distribution Center Pennsylvania American Waterline Projects Representative Baldwin Colewood Interceptor Upgrades and Rehabilitation, Equalization Village of Lawrence Sewage Facilities Project North Fayette Trail Connector Road Program Summary Map – Baldwin Borough Donohoe Road Sanitary Sewer Extension Center Township Park Improvements Charles E. Kelly Recreation Park – Collier Township NPDES Compliance & Long-Term Control – West Newton Borough Walker Park Stream Restoration – Edgeworth Borough Pilot – Findlay Location North Fayette Township Zoning Map Leetsdale Industrial Park Columbia Gas BASF Water Service Connection Duquesne University – Murphy’s Bottom Ecological Project Ridge Road Industrial Park 3 Rivers Wet Weather, Inc. Program Manager Contract Oak Grove Road Stormwater Improvements Beech Street & Elmer Street Stormwater Improvements – Edgewood Borough First Energy Nuclear Operating Company (FENOC) Borough of Seven Fields Erie East Bay Front Greenway Trail North Fayette Township Municipal Complex / Public Works Garage Municipal Water Authority of Aliquippa – Water Filtration Plant Water System Study & Improvements – Brighton Township Municipal Authority 3 Rivers Wet Weather Green Stormwater Infrastructure Feasibility Study Indiana University of Pennsylvania FEMA LOMR Elkhorn Run STP Final Clarifier Rehabilitation Pheasant Crossing Residential Development Villas of South Park Bridgewater Crossing – Brownfield Redevelopment Moon Township Parks Peoples Natural Gas Linesville Borough – Water System Improvements Moon Township Public Works Garage Ridgeview Estates Donovan Farms Findlay Industrial Park – Phase 3 North Sewickley Township Sewage Facilities Collection Ambridge Water Authority Partial Hydraulic Model Flow Test Map FedEx Ground National Expansion Program Coraopolis Riverfront Park Brighton Road Lift Station Improvements Washington Mall Redevelopment – Demolition Edinboro University – Infrastructure Upgrade Findlay Industrial Park – Phase 2 Center Township Potable Water The Home Depot Pine Synthetic Fields Findlay Industrial Park – Phase 1 G.E. Additive Technology Building Sanitary Sewer CCTV & Manhole / Point Source Repairs – Oklahoma Borough Collier Township Community Park Pleasant Hills Municipal Building Castlewood Fields Louisiana Avenue Stormwater Improvement ALMONO – Mill 19 Chapman Westport Hillwood Development – Parcel A Westport Ridge Building No. 2  & 3 Hempfield Area School District Stormwater Management Improvements Coraopolis Water System Improvements Elkhorn Run Sewage Treatment Plant Headworks Improvements Pleasant Hills Breisinger Field Martinsburg Nitrate Removal Water Treatment System Coraopolis GIS Program Flood Protection Project – Tucker County, West Virginia  South Home Stormwater Improvements McKay Street Stormwater Improvements Oakwood Manor Southmoreland High School Parking Lot Stormwater Improvements Allegheny Valley School District Engineering Services North Fayette Community Center Braddock Lock and Dam Moon Township Police Station Mapping and Facilities Westport Ridge Building 1 Martinsburg Municipal Authority Wastewater Treatment Plant GetGo Carnegie Mellon University Utah Street Waterline Replacement – Neville Township Tuscan Hills Development Neville Township Water Distribution System Pleasant Hills Borough Wet Weather Facilities Castle Shannon Borough Parks South Side Works