Findlay Industrial Park – Phase 3
Findlay Industrial Park – Phase 3
LSSE prepared Property and Subdivision plans on this 373-acre former surface mine property for the purpose of constructing a 1,200 LF extension of Solar Drive in preparation for future site development.
Work included preparation of site development plans, including grading, drainage, and utilities; street lighting plans; sanitary sewers and waterlines; erosion and sedimentation control plans, report and details; stormwater management report; post-construction stormwater management report; and roadway design.
LSSE’s scope of work included:
- Conceptual Plan Preparation
- Surveys for Wetland Location and Subdivision Plans / Construction Stakeout
- Subdivision Plan Preparation
- Erosion and Sedimentation Control Plan and Report
- Utility Coordination
- Preliminary and Final Land Development Plans
- Stormwater Management Plan and Report, including green infrastructure BMPs
- DEP Permitting (NPDES) and Post Construction Stormwater Management including design of vegetated swales, a bio-filtration fore bay, and stormwater dry detention basin
- Construction Specifications
- Contract Administration